First Lutheran School Expansion
Starting in 1996, Design Innovation Architects (DIA) was commissioned by First Lutheran Church to assist in stabilizing the structure and foundations of their elegant sanctuary. Over the years, the Building Committee’s trust and satisfaction in DIA’s performance led them to commission DIA repeatedly to study various site and building planning issues. The latest of these was the design of a 27,000-square-foot addition to their existing school.