Nucor Towers
This project involved the design and construction of four buildings, equaling approximately 370,000 SF. The project is a design build, industrial project that will focus on the manufacturing and galvanization of steel poles. The buildings were phased in design and construction, with the Pole Building permitted first, followed by the Galvanizing Building, the Administrative Building, and then the Blast Building. All four buildings were single-story, pre-engineered metal buildings, but the Galvanizing Building housed an equipment platform throughout half of its footprint.